BARECO

Medical Rehabilitation & Long Stay Project with Hotel and Residence

The location of Banya (Karlovo) has a historical background as a rehabilitation spot. Tzar Boris III had been treated in the late 1920’s and built a residence in 1929, followed by a first medical healing structure. The Developer bought 27.000 sqm of land in the outskirts of Banya. On the land exists a 3- story main building (rough construction, never used), a huge medical treatment area, a covered 25m pool and preparations for smaller pools aside. The building structure is considered healthy and currently all verticals which are not of carrying structure are cleaned out. All public connections like water and electricity are existing. A concession for mineral hot water has been granted. Given from our common input, a conversion of the existing building is planned by cutting away about 50% of it and replacing the space with an attractive sense of arrival, cross-integrated public areas and a smooth connection to the newly built (planned) 5 pavilions with 24 large scale rooms each. Vertical connections are explained in the master plan. The existing underground section allows a spacious and functional back-of-the house and optimized staff movement. In addition, 18 detached houses with separate access are planned to be located with certain distance to the hospitality installations.

Year: 2024
TFA: 16500 sq m; Plot area 27000 sq m;
Type: Rehabilitation and medical centre with hotel facility
Investor: Ait Rent Development Ltd
Status: Project